Featured Projects

Energy Audit - Trenton WWTP
Process Results performed an energy audit on the Trenton Waste Water Treatment Plant.

Exterior Lighting Replacement
Process Results performed a detailed analysis of the exterior lighting systems at a paint manufacturer industrial facility.

UM - East Quad - Plumbing (BIM Coordination)
Process Results was responsible for modeling the designed plumbing system and coordinating the installation using Building Information Modeling (BIM) for the UM East Quad in Ann Arbor. BIM is a shared knowledge resource allowing designers to actively interface with a 3D representation of the facility prior to construction.

WWRA - Single Stream Expansion
The WWRA Single Stream Expansion project involved the design and construction of a new multi-million dollar recycling facility.

WISD - High Point Gym Lighting
The WISD High Point Gym Lighting project involved the planning, design, installation, and commissioning of new light fixtures and controls in the gymnasium at High Point School.

Energy Audit / Evaluations
Process Results performed an energy audit on selected buildings for a pharmaceutical company.

UM Hospital - Occupancy Controls Pilot
The Occupancy Controls Pilot project involved the addition of motion sensors in various areas within the University of Michigan hospital facility to control lighting and HVAC based on occupancy patterns.

Chemical Facility - Arc Flash Hazard Analysis
Process Results performed the data collection and modeling of a chemical facility electrical system. Electrical studies were performed on the system modeled in SKM Power Tools.

Furniture Manufacturer - Arc Flash Hazard Analysis
Process Results performed the data collection and modeling of a furniture manufacturer electrical system. Electrical studies were performed on the system modeled in SKM Power Tools.

Hospital - Data Center Cooling
The Hospital Data Center Cooling project located in Ann Arbor involved engineering services for the evaluation and upgrade of the air conditioning system for the planned addition of computer equipment to an existing server room.

Hospital and Health Centers
The Health Center projects involved engineering services for various renovations in the Briarwood (Ann Arbor), Saline and Brighton Health Center facilities converting the record storage areas into call centers, exam rooms and/or patient restrooms.

Recycling Facility Upgrade
The project involved the planning, design, procurement, construction, programming and startup of a facility to recycle waste production material and aged product.

Air Conditioning for New Computer Lab
The Computer Lab Air Conditioning project involved the planning and installation of a new heating, ventilation and air conditioning (HVAC) unit to serve a computer lab, the mainframe computer area and the adjacent technical service office.

Air Conditioning Upgrade for Data Center
The Air Conditioning project involved Ann Arbor engineering service for the planning, design, installation and startup of two new Computer Room Air Conditioning (CRAC) units to the existing Data Center at the University of Michigan.

Chemical Facility Upgrade
The Chemical Facility Upgrade project involved planning, design, installation and startup of a facility to produce, bottle and package a variety of chemical products.

Chilled Water System Upgrade Study
The Chilled Water System project involved the planning of long-term equipment repair and replacement for a 16,000-ton chilled water system at a pharmaceutical manufacturing facility.

Chiller Plant Commissioning
The Chiller Plant project involved commissioning services during the construction of a 4,000-ton central chiller plant at University of Michigan's North Campus.

Clean Room Process
The clean room process project involved the planning, design, and cost estimation for a process to prepare chemicals and to sequence a coating process. Modifications to existing systems as well as a DI water system upgrade were required.

CMP Plant Expansion
The CMP Plant Expansion project involved planning, design, installation, startup and project management of a plant expansion.

Customer Technology Center
Process Results provided engineering services for the Ann Arbor Customer Technology Center (CTC) project which involved design of the mechanical systems for a new $11 million, 103,500 sq. ft. three story facility.

Drug Manufacturer Lab Renovation
The Lab Renovation project involved the planning, design, and installation of equipment and casework to improve the functionality of lab spaces.

Drug Manufacturing Facility
The Drug Manufacturing Facility project involved the planning, design, installation and startup of a facility to produce and package an injectable drug. Extensive building modifications were required to meet regulations, sterile environments, and Good Manufacturing Practices (CGMP).

Ethyl Silicate Manufacturing
The Ethyl Silicate project involved configuration of PLC based controls for a batch distillation system.

Explosives Recycling
The Explosive Processing project involved the design and selection of equipment for processing retired military munitions and recovering the components.

Groundwinds Building Controls
The Groundwinds Building Controls project involved the planning, design, installation and startup of controls for auxiliary instrument and building utilities.

Hot Oil Skids
The Hot Oil Skids project involved the design, installation and startup of four skid mounted hot oil systems in a chemical production facility.

Large Video Board
The Large Video Board project included the mechanical design, equipment procurement and startup of cooling systems for large video boards.

Material Transfer and Liquid Storage
The Material Transfer and Liquid Storage project included the upgrade of pneumatic and mechanical controls to a Programmable Logic Controller (PLC) based automated system.

Milford Wastewater Plant Roof Repair
The Milford Wastewater Plant Roof Repair project involved the repair and replacement of the membrane roofing system on three existing buildings at the Milford Wastewater Treatment Plant.

Office Renovation/Addition
The office renovation project located in Ann Arbor involved the planning, design and construction of a new entrance, offices, conference rooms, cafeteria/meeting rooms and locker/toilet facilities.

Petroleum Refinery
This Petroleum Refinery project involved the planning and design for a 10,000-barrel petroleum slop tank, including a cathodic corrosion protection system and a geo-synthetic spill containment liner beneath the tank.

Server/Network Ops Room
The Server/Network Ops Room project located in Ann Arbor involved the creation of 2000 sq. ft. of secured and monitored space within an existing building for the CSI main computer system and network operations.

UM Towsley Center - Occupancy Sensors for Lighting and HVAC
The Occupancy Sensors project located in Ann Arbor involved the planning, design, installation and commissioning of sensors to control lighting when spaces are unoccupied.

UM - Temporary Cooling
The Temporary Cooling project involved engineering temporary cooling to four critical areas during the period when the University of Michigan converted many of its North Campus facilities to be served by a new centralized chilled water plant.

UM Alumni Memorial (Art Museum)
The Alumni Memorial (Art Museum) project at the University of Michigan involved improving the temperature and humidity control within the building and providing means to monitor the air handling systems on a continuous basis.

UM Forecast IT
The Forecast IT energy planning system project involved the development of a computer application which enables the University of Michigan to forecast the energy load over the upcoming ten days.

UM Green Lights Program
The Green Lights program involved the design of new energy efficient lighting and the implementation of the system into a Chemistry building.

UM MSRB - Chiller Plant Modifications
The Chiller Plant Modifications project involved the investigation and modification of four (4) absorption chillers with a total capacity of 3,340 tons.

UM MSRB - Hydrostatic Pump Replacement
The Hydrostatic Pump Replacement project involved design to replace pumps equipped with hydroconstant speed drives with pumps controlled by variable frequency drives.

UM MSRB - Mercury Vapor Lighting Replacement
The Mercury Vapor Lighting Replacement project involved detailed audit and analysis, estimation, coordination, design, and construction management for a lighting upgrade project.

UM Revelli Building Lighting Upgrades
The Revelli Lighting Upgrades project involved the planning, design and installation of high-bay light fixtures in the main band room.

UM TRI - ENERGY STAR Lighting
The ENERGY STAR Lighting project involved detailed audit and analysis, coordination, design, bid process, and construction management for a lighting upgrade project at the Transportation Research building at the University of Michigan.

UM TRI Ceiling Replacement
The project involved detailed design, bid process, and construction management for a ceiling replacement at the Transportation Research Institute building at the University of Michigan.

WFI Capacity Increase
The WFI Capacity Increase project involved the planning, design, installation, startup and commissioning of a facility to produce WFI (Water for Injection) to support a drug manufacturing facility.

UM - Energy Audit
The Energy Audit project involved performing energy audits for eight different facilities at the University of Michigan Dearborn campus.

Dana Flume Lab
The Dana Flume Lab project located in Ann Arbor involved engineering services converting a 1,460 sq. ft. storage room into a flume lab capable of housing 150 water flumes.

UM Kraus Building - Occupancy Sensors
The project involved the installation of occupancy sensors to control HVAC and lighting on the first through fourth floors of the E.H. Kraus building.

UM Weill Hall - Lighting Improvements
The project involved the installation and replacement of lighting occupancy controls in classrooms and offices, along with daylight occupancy sensors that were installed throughout the corridors of the UM Weill Hall.

Product Distribution Center - Arc Flash Hazard Analysis
Process Results performed the data collection and modeling of a Product Distribution Center electrical system. Electrical studies were performed on the system modeled in SKM Power Tools.

Plastics Production Facility Expansion
The Plastics Production Facility Expansion involved planning, design and construction of a production process, extrusion process, material handling and building expansion.

Chelsea Wastewater Treatment Expansion
The Chelsea Wastewater Treatment Expansion project consisted of engineering services for Washtenaw County during the expansion of the Chelsea Wastewater Treatment Plant to 1.8 MGD.

YMCA - Gym Lighting Controls
The YMCA Gym Lighting Controls project involved design, construction management, and commissioning services for a new lighting control system serving the main gymnasium at the Ann Arbor, MI facility.

Processing Facility Relocation
The Processing Facility Relocation project located in Washtenaw County involved engineering services the planning, design, installation and startup of a facility to produce and store archival microfilm/microfiche from print and digital media.

Diesel Emission Fluid
The Diesel Emission project located in Livingston county involved engineering for the planning and detailed design for Diesel Emission Fluid (DEF) distribution infrastructure to deliver DEF to over 100 test cells.

Energy Audit - City of Grand Blanc
Process Results performed an energy audit on several municipal buildings in the City of Grand Blanc.

Custom AHU's Replacement
The Custom AHU Replacement project involved the planning, design, installation and startup of two (2) customer built-up air handling units.

Ann Arbor Ice Cube - Energy Audit
Process Results performed an energy audit on the Ann Arbor Ice Cube facility which provided a detailed analysis on existing lighting, HVAC, and ice rink refrigeration systems.

Production and Bottling Facility
The Production and Bottling project located in west Michigan involved the construction of a personal care products mixing and bottling facility.

UM Housing - ENERGY STAR Program
This University Housing project included evaluation of 15 university housing facilities (2.8 million square feet) for energy consumption and conservation.

Chiller Plant Lifecycle Cost Assessment
Process Results evaluated a proposed central chiller plant at the University of Michigan North Campus in Ann Arbor. The lifecycle cost of the 4,000-ton central chiller plant was compared to the cost of distributed, stand-alone chiller installations located in individual buildings.